logo

Renshou County Domestic Waste Incineration Power Generation Project

The status, timeline and source of this project. A free account opens every field.

Source: World Bank Group

Project
Active

The project entails the construction of a domestic waste incineration power plant with a daily capacity of 1,200 tons, which will be built in Renshou County, Sichuan Province, China. The plant will be built in 2 phases.

The first phase will be 800 tons/day. The 2×400 tons/day incineration line will use 18MW condensing steam turbine generator. The second phase will add a 400 tons/day incineration

Status
Prospective
Sector
Biomass, Wind, Government, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Commercial, Manufacturing (Industrial)
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Renshou County Domestic Waste Incineration Power Generation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Renshou County Domestic Waste Incineration Power Generation Project” is an infrastructure initiative in the Biomass sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project entails the construction of a domestic waste incineration power plant with a daily capacity of 1,200 tons, which will be built in Renshou County, Sichuan Province, China. The plant will be built in 2 phases. The first phase will be 800 tons/day. The 2×400 tons/day incineration line will use 18MW condensing steam turbine generator. The second phase will add a 400 tons/day incineration line and a 9MW condensing steam turbine generator. The annual power generation capacity is 156 million kWh/a, of which the first phase is 104 million kWh/a, and the annual on-grid power is 125 million kWh/a, of which the first phase is 0.83 billion kWh/a. Sponsors of the project are Sichuan Energy Investment Group (70%) and Renshou Water Supply and Drainage Co. (30%). The BOT concession has a duration of 30 years. The total value of the project is $103.2 million. http://www.cpppc.org:8083/efmisweb/ppp/projectLibrary/getProjInfoNational.do?projId=bac9d265da6c46edb222fbbf5c6da78c

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Biomass, Wind, Government, Power Generation (CCGT), Waste Processing and Treatment, Water Supply and Storage, Commercial, Manufacturing (Industrial)

Article published date

2024-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project