Renton Transit Center and Roadway Improvements
Sector: Energy Storage • Location: Renton, Washington, United States of America
Source: Dodge
SCOPE OF WORK: The Work of this Contract includes, but is not limited to, construction of a new transit center located at the northeast corner of S. Grady Way and Ranier Avenue S. The work includes: Site preparation, construction of a new transit center bus bay island to accommodate eight (8) active bays with new custom steel canopy structure, new facility buildings, new steel framed gantry with p
- Status
- Closed
- Sector
- Energy Storage, Automotive, Road, Power Generation (CCGT), Government, Steel, Metal, Commercial
- Location
- Renton, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Renton Transit Center and Roadway Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | SCOPE OF WORK: The Work of this Contract includes, but is not limited to, construction of a new transit center located at the northeast corner of S. Grady Way and Ranier Avenue S. The work includes: Site preparation, construction of a new transit center bus bay island to accommodate eight (8) active bays with new custom steel canopy structure, new facility buildings, new steel framed gantry with perforated aluminum panels, new Battery Electric Bus (BEB) equipment yard, a new intersection at R... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Renton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Automotive, Road, Power Generation (CCGT), Government, Steel, Metal, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in United States of America
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 9.6 KW 24 MODULES AND 13.5 KWH ENERGY STORAGE SYSTEM N 225A LOAD CENTER
- ROOFTOP SOLAR PV INSTALL. (8) 400W MODULES AT 3.2 KW TOTAL. INSTALL (1) (N) ESS TELSA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 7.02 KW 18 MODULES AND 1 CHEM BATTERY AT 9.8KWH
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 3.78 KW 13.5KH ENERGY STORAGE SYSTEM
- INSTALL (16) TILTED 355W MODULES AT 5.68 KW TOTAL. INSTALL ( 1) TESLA POWERWALL BATTERY AT 13.5 KWH.
- INSTALL TESLA SOLAR ROOF 13.92 KW 27 KWH ENERGY STORAGE SYSTEM NEW 225A DISTRIBUTION PANEL
- ROOFTOP PV SOLAR PANEL INSTALL (21) 400W MODULES AT 8.4 KW T OTAL. INSTALL (1) LG CHEM BATTERY AT 9.88 KWH CAPACITY
- ROOFTOP SOLAR PANEL INSTALL: (10) 400W MODULES AT 4.0 KW TOT AL. INSTALL (1) LG CHEM BATTERY AT 9.8 KWH CAPACITY.
