Repair and rehabilitate 152 m of a deteriorating 750 mm trunk sewer that runs through the Brick Pond wetland
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
The trunk sewer, constructed in 1960 at the northern limits of the Brick Pond wetland contains a 152 m section of 750 mm asbestos bonded, fully coated, paved invert, corrugated metal pipe placed on timber piles. Structural analysis has determined that typical relining or slip lining options could cause structural failure of the aging wooden support structure. Design has been modified to allow for
- Status
- Closed
- Sector
- Waste Processing and Treatment, Metal, Forest Products and Packaging, Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Repair and rehabilitate 152 m of a deteriorating 750 mm trunk sewer that runs through the Brick Pond wetland
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The trunk sewer, constructed in 1960 at the northern limits of the Brick Pond wetland contains a 152 m section of 750 mm asbestos bonded, fully coated, paved invert, corrugated metal pipe placed on timber piles. Structural analysis has determined that typical relining or slip lining options could cause structural failure of the aging wooden support structure. Design has been modified to allow for a light-weight liner with increased flexibility. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Metal, Forest Products and Packaging, Water Supply and Storage |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
