Repair and Replace Split Rail Fence
Sector: Car parking • Location: United States of America
Source: Grants.gov
The National Park Service (NPS), Wolf Trap National Park for the Performing Arts (WOTR) will be providing a cooperative agreement with an SCA organization the replacement of the parks deteriorated split rail fencing system. Approximately 6000 linear feet of rail fence, 660 locust line posts and 50 locust corner post will be replaced with 1,980 hemlock rails, 660 locust line post and 50 locust corn
- Status
- Closed
- Sector
- Car parking, Rail, Government, Automotive, Education
- Location
- United States of America
- Updated
- 22 Jul 2026
- Source
- Grants.gov
ConstructChat
Ask ConstructChat about Repair and Replace Split Rail Fence
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | archived |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The National Park Service (NPS), Wolf Trap National Park for the Performing Arts (WOTR) will be providing a cooperative agreement with an SCA organization the replacement of the parks deteriorated split rail fencing system. Approximately 6000 linear feet of rail fence, 660 locust line posts and 50 locust corner post will be replaced with 1,980 hemlock rails, 660 locust line post and 50 locust corner posts. Project is to replace deteriorated fence rail fence in the park around the Filene Center Gill’s Hill and East lot. The fence was installed with poor quality wood and is showing severe rot throughout the entire fence system. As a result of the deterioration, the fence system is failing (broken/ falling over) in numerous locations. The fence system is used to delineate parking areas, visitor paths and garden areas in the park DEMO 1.) Demo approximately 6000 LF of old split rail fence, 660 locust line post, 50 locust corner post and disposal of old fence material in high use areas of the park (Filene Center, Gill’s Hill parking area and East lot) 2.) Clearing all brush encroaching on fence lines REPLACE Split Rail, Line Post and Corner Post Approximately 6000 linear feet of rail fence, 660 locust line posts and 50 locust corner post will be replaced with 1,980 hemlock rails, 660 locust line post and 50 locust corner posts in same locations and post holes. |
Budget |
Location
Country | United States of America (USA) |
Source
Source reliability | High |
Source | Grants.gov |
URL |
More Details
Record type | Project |
Sector | Car parking, Rail, Government, Automotive, Education |
Article published date | 2023-06-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
- School zone beacon replacement project
