Repair and Retrofit of Holton Pond, NAS Patuxent River, MD
Sector: Hydro • Location: United States of America
Source: Grants.gov
Holton Pond is located at the intersection of Shaw Road and Tate Road on Naval Air Station Patuxent River (PAXR). It was built during the 1960s and is fed by Sewall and Calvert Ponds. Currently Holton Pond is used primarily for recreational fishing at PAXR. Unfortunately, due to the age of Holton Pond, the original storm drainage pipes are in danger of failing. Failure of these pipes will res
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Holton Pond is located at the intersection of Shaw Road and Tate Road on Naval Air Station Patuxent River (PAXR). It was built during the 1960s and is fed by Sewall and Calvert Ponds. Currently Holton Pond is used primarily for recreational fishing at PAXR. Unfortunately, due to the age of Holton Pond, the original storm drainage pipes are in danger of failing. Failure of these pipes will result in stream flooding, possible sediment release containing harmful residue and potential loss of road access into parts of the Installation.The earthen dam creating Holton Pond is leaking and must be replaced. The sediment dam and the corresponding storm drainage pipes need to be retrofitted before the Pond can be refilled. Holton Pond also needs an additional water level control structure to be considered compliant with Maryland Department of the Environment (MDE) requirements. In 2000, Southern Maryland Resource Conservation and Development Area was contracted to provide the necessary technical studies, design plans and acquire the permits necessary to complete this effort. The original designs were completed in 2006 and submitted to MDE for permitting in 2006. After numerous rounds of consultation with both MDE and the Army Corps of Engineers (ACOE), and the permit was granted on March 26, 2009 allowing this project to move forward. This work will be accomplished per the Navy approved permitted plans currently held at PAXR. The construction will include retrofits for the earthen dam and existing storm drainage pipes as well as construction of a water level control device. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
