Repair main sewage pump house building
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The main sewage pump house building footing is badly damaged due to frost and heaving. It must be repaired in order to prevent further damage to the building and its contents. In addition, the electrical wires going from the pump house to the exterior pumps are badly damaged and need to be replaced immediately.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Repair main sewage pump house building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The main sewage pump house building footing is badly damaged due to frost and heaving. It must be repaired in order to prevent further damage to the building and its contents. In addition, the electrical wires going from the pump house to the exterior pumps are badly damaged and need to be replaced immediately. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
