logo

Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections.

Completed · Ontario

Source: Infrastructure Canada

Project
Completed

Repairs to programmable logic controller (PLC) due to recent PLC program failure. The PLC is now running on a temporary system. Objective: To replace the old out of commission PLC which runs the high lift side of the water plant. Scope: To purchase the hardware, design and create the program, install at the plant, satisfy regulators, test the new system and provide training on the new system to th

Status
Closed
Sector
Water Supply and Storage, Road, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Repair programmable logic controller (PLC) at the water treatment plant. Located at the Elk Lake water Treatment plant, 4 First Street which serves 440 residents and 160 service connections.” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Repairs to programmable logic controller (PLC) due to recent PLC program failure. The PLC is now running on a temporary system. Objective: To replace the old out of commission PLC which runs the high lift side of the water plant. Scope: To purchase the hardware, design and create the program, install at the plant, satisfy regulators, test the new system and provide training on the new system to the staff. Output: A fully functioning PLC at the water plant.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government

Article published date

2026-02-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project