Repairing Essential Logistics Infrastructure & Network Connectivity (RELINC) Project
Active · Ukraine
Source: World Bank Group
The development objectives of Repairing Essential Logistics Infrastructure and Network Connectivity (RELINC) Project is to provide the means for mitigating the immediate impact that disrupted transport networks have on Ukraine’s population and economy. This project has two components. 1) The first component, Lifeline road connections, has the following sub-components: (i) Modular bridges needed to
- Status
- Prospective
- Sector
- Mass Transit, Road, Rail, Bridge, Warehouse, Seaport, Forest Products and Packaging, Government
- Location
- Ukraine
- Updated
- 19 Nov 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Repairing Essential Logistics Infrastructure & Network Connectivity (RELINC) Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The development objectives of Repairing Essential Logistics Infrastructure and Network Connectivity (RELINC) Project is to provide the means for mitigating the immediate impact that disrupted transport networks have on Ukraine’s population and economy. This project has two components. 1) The first component, Lifeline road connections, has the following sub-components: (i) Modular bridges needed to restore damaged bridge connections; (ii) Materials required for urgent road and artificial structures repairs and winter access; and (iii) Enhancement to western road Border Crossing Points (BCPs) to mitigate impacts of Black Sea disruption. The second component, Lifeline rail connections, has the following sub-components: (i) Flatbed wagon production to increase containerized transport capacity; (ii) Materials, components, and equipment for repair of vital rail lines; (iii) Rolling stock for operational efficiency; and (iv) Materials, equipment, and modular bridges for damaged rail bridge repairs. |
Original sector | FY17 - Transportation |
Budget |
Location
Country | Ukraine |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Road, Rail, Bridge, Warehouse, Seaport, Forest Products and Packaging, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
