logo

Repairing Essential Logistics Infrastructure & Network Connectivity (RELINC) Project

Sector: Mass Transit • Location: Ukraine

Source: World Bank Group

Project
Active

The development objectives of Repairing Essential Logistics Infrastructure and Network Connectivity (RELINC) Project is to provide the means for mitigating the immediate impact that disrupted transport networks have on Ukraine’s population and economy. This project has two components. 1) The first component, Lifeline road connections, has the following sub-components: (i) Modular bridges needed to

Project Information FAQ

Project Information

5 Q
The project “Repairing Essential Logistics Infrastructure & Network Connectivity (RELINC) Project” is an infrastructure initiative in the Mass Transit sector, located in Ukraine. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objectives of Repairing Essential Logistics Infrastructure and Network Connectivity (RELINC) Project is to provide the means for mitigating the immediate impact that disrupted transport networks have on Ukraine’s population and economy. This project has two components. 1) The first component, Lifeline road connections, has the following sub-components: (i) Modular bridges needed to restore damaged bridge connections; (ii) Materials required for urgent road and artificial structures repairs and winter access; and (iii) Enhancement to western road Border Crossing Points (BCPs) to mitigate impacts of Black Sea disruption. The second component, Lifeline rail connections, has the following sub-components: (i) Flatbed wagon production to increase containerized transport capacity; (ii) Materials, components, and equipment for repair of vital rail lines; (iii) Rolling stock for operational efficiency; and (iv) Materials, equipment, and modular bridges for damaged rail bridge repairs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data