logo
ProjectCompleted

Replace 15 Main Valves Within the Water Distribution System

Completed · Ontario

Source: Infrastructure Canada

This project will replace 15 main valves in the water distribution system and includes restoration of roads where excavation occurs with an aim of increasing efficiency. Distribution system - 15 main valves broken (8” Water Mains Control Valves for Isolating the system). Currently there are locations in town where, if we have an issue, we are forced to shut off up to 6 valves where only 2 would ha

Status
Closed
Sector
Water Supply and Storage, Road, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Replace 15 Main Valves Within the Water Distribution System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Replace 15 Main Valves Within the Water Distribution System” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will replace 15 main valves in the water distribution system and includes restoration of roads where excavation occurs with an aim of increasing efficiency. Distribution system - 15 main valves broken (8” Water Mains Control Valves for Isolating the system). Currently there are locations in town where, if we have an issue, we are forced to shut off up to 6 valves where only 2 would have been required if all the valves were working. This increases the number of residences affected during a shut-off situation and makes the work far more complicated. Improved environmental outcome: Control & Management of treated water; Reduction of waste of treated water; Reduction of contamination to ground due to current leaks and reduce the amount of water and energy needed for production to make up for any losses. As a result, less treatment chemicals are used; Reduction of ground excavating due to current water leaks and reduction of the water wasted to drain a water main to perform repairs.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project