logo

Replace 2 Turbidity meters, transfer switch and media, and Pump station (1 and 2) chlorine and electrical upgrades

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Water System Upgrade/Rehabilitation consisting of: Water treatment plant - Replace 2 turbidity meters, Replace Automatic Transfer Switch for standby power, Partial Replacement of Filter Media (Anthracite only), Booster Pump Station #1 - Installation of New Chlorine Analyzer and related work Booster Pump Station #2 - Replace Electrical panel and 50% of building wiring. Project objectives: * Improve

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Commercial, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Replace 2 Turbidity meters, transfer switch and media, and Pump station (1 and 2) chlorine and electrical upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Replace 2 Turbidity meters, transfer switch and media, and Pump station (1 and 2) chlorine and electrical upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Water System Upgrade/Rehabilitation consisting of: Water treatment plant - Replace 2 turbidity meters, Replace Automatic Transfer Switch for standby power, Partial Replacement of Filter Media (Anthracite only), Booster Pump Station #1 - Installation of New Chlorine Analyzer and related work Booster Pump Station #2 - Replace Electrical panel and 50% of building wiring. Project objectives: * Improve water filtration process * Upgrade disinfection system monitoring to comply with drinking water regulations * Replace electrical components to extend lifespan of pump station and standby power system at Water Treatment Plant Scope of Work: Refer to attached Water System Upgrade/Rehabilitation Spreadsheet for details Output/Benefit of Project: * Water filtration improvements made at the water treatment plant will impact the whole community (285 households/800 residents) * Booster Pump Station #1 improvements will ensure adequate chlorine residuals for 15+ households * Booster Pump Station #2 improvements will ensure reliable power to increase water pressure for 14 households

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Commercial, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project