Replace 2 Turbidity meters, transfer switch and media, and Pump station (1 and 2) chlorine and electrical upgrades
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Water System Upgrade/Rehabilitation consisting of: Water treatment plant - Replace 2 turbidity meters, Replace Automatic Transfer Switch for standby power, Partial Replacement of Filter Media (Anthracite only), Booster Pump Station #1 - Installation of New Chlorine Analyzer and related work Booster Pump Station #2 - Replace Electrical panel and 50% of building wiring. Project objectives: * Improve
- Status
- Closed
- Sector
- Water Supply and Storage, Power Generation (CCGT), Commercial, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replace 2 Turbidity meters, transfer switch and media, and Pump station (1 and 2) chlorine and electrical upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Water System Upgrade/Rehabilitation consisting of: Water treatment plant - Replace 2 turbidity meters, Replace Automatic Transfer Switch for standby power, Partial Replacement of Filter Media (Anthracite only), Booster Pump Station #1 - Installation of New Chlorine Analyzer and related work Booster Pump Station #2 - Replace Electrical panel and 50% of building wiring. Project objectives: * Improve water filtration process * Upgrade disinfection system monitoring to comply with drinking water regulations * Replace electrical components to extend lifespan of pump station and standby power system at Water Treatment Plant Scope of Work: Refer to attached Water System Upgrade/Rehabilitation Spreadsheet for details Output/Benefit of Project: * Water filtration improvements made at the water treatment plant will impact the whole community (285 households/800 residents) * Booster Pump Station #1 improvements will ensure adequate chlorine residuals for 15+ households * Booster Pump Station #2 improvements will ensure reliable power to increase water pressure for 14 households |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Generation (CCGT), Commercial, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
