logo

Replace ABAAS Vault Toilet at Zenith Day Use Area

Sector: Oil and Gas • Location: Oneida, Tennessee, United States of America

Source: Dodge

Project
Planning Schematics

BISO - Replace Temporary Chemical Toilet with ABAAS Vault Toilet at Zenith Day Use Area. Purchase and installation of a permanent ABAAS vault toilet.

Status
Prospective
Sector
Oil and Gas, Chemical (Industrial), Manufacturing (Industrial), Commercial
Location
Oneida, Tennessee, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Replace ABAAS Vault Toilet at Zenith Day Use Area

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Replace ABAAS Vault Toilet at Zenith Day Use Area” is an infrastructure initiative in the Oil and Gas sector, located in Oneida, Tennessee, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

planning schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

BISO - Replace Temporary Chemical Toilet with ABAAS Vault Toilet at Zenith Day Use Area. Purchase and installation of a permanent ABAAS vault toilet.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Tennessee

City

Oneida

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Oil and Gas, Chemical (Industrial), Manufacturing (Industrial), Commercial

Article published date

2025-08-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project