Replace an Existing Private Residential Dock
One of 10,000+ projects Taiyo tracks in South Carolina.
Source: Dodge USA
the proposed dock consists of a 4'x360' walkway leading to 19'x20' fixed pier head with a 21'x22' roof. A 10'x20' floating dock will be accessed by a 3'x20' gangway. A 12.5'x14' boat lift is also included.
- Status
- Closed
- Sector
- Residential, Government, Commercial, Manufacturing (Industrial)
- Location
- Charleston, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Replace an Existing Private Residential Dock
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the proposed dock consists of a 4'x360' walkway leading to 19'x20' fixed pier head with a 21'x22' roof. A 10'x20' floating dock will be accessed by a 3'x20' gangway. A 12.5'x14' boat lift is also included. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | Charleston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Residential, Government, Commercial, Manufacturing (Industrial) |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
