Replace Existing Drinking Fountains with Bottle Filling Stations; Retrofitting Open Concept Areas; HVAC Upgrades
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
HVAC upgrades in several indoor locations to address air quality issues. Installation of water bottle filling stations in several indoor locations to reduce transmission risk. Retrofitting open concept areas with physical walls with sinks in several indoor locations to enhance physical distancing.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replace Existing Drinking Fountains with Bottle Filling Stations; Retrofitting Open Concept Areas; HVAC Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | HVAC upgrades in several indoor locations to address air quality issues. Installation of water bottle filling stations in several indoor locations to reduce transmission risk. Retrofitting open concept areas with physical walls with sinks in several indoor locations to enhance physical distancing. |
Original sector | Ventilation Systems |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
