Replace existing storm sewer and appurtenances, and construct a Stormwater Management Pond
Completed · Ontario
Source: Infrastructure Canada
The project will replace and upsize 525m of deteriorating and aging storm sewer, improve inlet infrastructure and provide a stormwater retention facility. The objective of the project is to reduce frequency and extent of surface flooding on public and private properties, and reduce surcharging of storm sewers in high flow events without increasing flows to downstream components of the system. It i
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Steel, Waste Processing and Treatment, Government, Metal
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replace existing storm sewer and appurtenances, and construct a Stormwater Management Pond
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will replace and upsize 525m of deteriorating and aging storm sewer, improve inlet infrastructure and provide a stormwater retention facility. The objective of the project is to reduce frequency and extent of surface flooding on public and private properties, and reduce surcharging of storm sewers in high flow events without increasing flows to downstream components of the system. It is also intended to replace aging and failing existing sewers. The existing sewers range from 300 mm to 1050 mm diameter. The new sewers will range from 300 mm to 2100 mm diameter. The existing material is corrugated steel pipe and concrete, and proposed pipe material for small bore pipe is PVC and large bore will be reinforced concrete. One portion of the sewer will be a 1.8m by 1.2m concrete box culvert. The Stormwater Management Facility is designed for a 1 in 100 year return period and the Regional Storm, and design storm volume in the retention facility is approximately 8 hectare-meters (80,000 cubic meters). |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Waste Processing and Treatment, Government, Metal |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
