logo
ProjectCompleted

Replace existing storm sewer and appurtenances, and construct a Stormwater Management Pond

Completed · Ontario

Source: Infrastructure Canada

The project will replace and upsize 525m of deteriorating and aging storm sewer, improve inlet infrastructure and provide a stormwater retention facility. The objective of the project is to reduce frequency and extent of surface flooding on public and private properties, and reduce surcharging of storm sewers in high flow events without increasing flows to downstream components of the system. It i

Status
Closed
Sector
Water Supply and Storage, Cement, Steel, Waste Processing and Treatment, Government, Metal
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Replace existing storm sewer and appurtenances, and construct a Stormwater Management Pond

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Replace existing storm sewer and appurtenances, and construct a Stormwater Management Pond” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project will replace and upsize 525m of deteriorating and aging storm sewer, improve inlet infrastructure and provide a stormwater retention facility. The objective of the project is to reduce frequency and extent of surface flooding on public and private properties, and reduce surcharging of storm sewers in high flow events without increasing flows to downstream components of the system. It is also intended to replace aging and failing existing sewers. The existing sewers range from 300 mm to 1050 mm diameter. The new sewers will range from 300 mm to 2100 mm diameter. The existing material is corrugated steel pipe and concrete, and proposed pipe material for small bore pipe is PVC and large bore will be reinforced concrete. One portion of the sewer will be a 1.8m by 1.2m concrete box culvert. The Stormwater Management Facility is designed for a 1 in 100 year return period and the Regional Storm, and design storm volume in the retention facility is approximately 8 hectare-meters (80,000 cubic meters).

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Cement, Steel, Waste Processing and Treatment, Government, Metal

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project