logo

Replace existing storm sewer and appurtenances, and construct a Stormwater Management Pond

Sector: Cement • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The project will replace and upsize 525m of deteriorating and aging storm sewer, improve inlet infrastructure and provide a stormwater retention facility. The objective of the project is to reduce frequency and extent of surface flooding on public and private properties, and reduce surcharging of storm sewers in high flow events without increasing flows to downstream components of the system. It i

Project Information FAQ

Project Information

5 Q
The project “Replace existing storm sewer and appurtenances, and construct a Stormwater Management Pond” is an infrastructure initiative in the Cement sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project will replace and upsize 525m of deteriorating and aging storm sewer, improve inlet infrastructure and provide a stormwater retention facility. The objective of the project is to reduce frequency and extent of surface flooding on public and private properties, and reduce surcharging of storm sewers in high flow events without increasing flows to downstream components of the system. It is also intended to replace aging and failing existing sewers. The existing sewers range from 300 mm to 1050 mm diameter. The new sewers will range from 300 mm to 2100 mm diameter. The existing material is corrugated steel pipe and concrete, and proposed pipe material for small bore pipe is PVC and large bore will be reinforced concrete. One portion of the sewer will be a 1.8m by 1.2m concrete box culvert. The Stormwater Management Facility is designed for a 1 in 100 year return period and the Regional Storm, and design storm volume in the retention facility is approximately 8 hectare-meters (80,000 cubic meters).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data