Replace Fish Creek C Loop Sewer Lift Station
Sector: Water Supply and Storage • Location: Montana, United States of America
Source: Dodge
Replace Fish Creek B%231083 C Loop Sewer Lift Station Equipment . Construction project to replace (aka bypass) the failed Loop C injector with a package lift station outside of the B%231083 Comfort/Lift Station. This project will install the new lift station and connect to the existing force main line. The antiquated injector system failed during start up in 2024, forcing the closure of both comfo
- Status
- Prospective
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Commercial
- Location
- Montana, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Replace Fish Creek C Loop Sewer Lift Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planning schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replace Fish Creek B%231083 C Loop Sewer Lift Station Equipment . Construction project to replace (aka bypass) the failed Loop C injector with a package lift station outside of the B%231083 Comfort/Lift Station. This project will install the new lift station and connect to the existing force main line. The antiquated injector system failed during start up in 2024, forcing the closure of both comfort stations in a reservation campground loop. Not good! |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Montana |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Raw Materials, Commercial |
Article published date | 2025-09-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
