Replace FM Parking Lot SOURCES SOUGHT
Sector: Water Supply and Storage • Location: Mammoth Cave, Kentucky, United States of America
Source: Dodge USA
The purpose of this project is to rehabilitate the maintenance parking area and improve water management systems. The work includes removing failed asphalt, sub-base, and sub-grade sections, followed by installing a 2-inch asphalt overlay across the existing parking lot. Damaged drainage systems will be removed and realigned, with new drainage installed to enhance water flow. Additional improvemen
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The purpose of this project is to rehabilitate the maintenance parking area and improve water management systems. The work includes removing failed asphalt, sub-base, and sub-grade sections, followed by installing a 2-inch asphalt overlay across the existing parking lot. Damaged drainage systems will be removed and realigned, with new drainage installed to enhance water flow. Additional improvements include constructing curb and gutter sections in front of maintenance buildings and around veg... |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Water Supply and Storage projects in United States of America
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
- KITCEHN REMODEL, REPLACE CABINETS, WATER AND WASTE LINES REDIRECTED, NEW ELECTRICAL LINES FROM MAIN PANEL
- LAFCO PROCESS FOR NEW WATER CONNECTION ON COH WATER SERVICE
- BUILDING (A): MANUFACTURING/MANUFACTURING SUPPORT SPACE, BOILER REPLACE, WATER PURIFICATION SYSTEM, HVAC, 652 SF MAIN
