Replace Highway AA Bridge
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The project includes existing structure removal, sitework, concrete, pile foundations, pre-manufactured bridge and installation, final seeding and mulching.
- Status
- Closed
- Sector
- Cement, Bridge, Manufacturing (Industrial), Road, Commercial
- Location
- Tebbetts, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Replace Highway AA Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes existing structure removal, sitework, concrete, pile foundations, pre-manufactured bridge and installation, final seeding and mulching. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Tebbetts |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Bridge, Manufacturing (Industrial), Road, Commercial |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
