Replace Sanitary Sewer Lines Buildings 2&4
Sector: Waste Processing and Treatment • Location: Topeka, Kansas, United States of America
Source: Dodge USA
The contractor shall provide all labor, material, and equipment to replace approximately 12 linear feet sanitary sewer line from and including the toilet flange in room A206 to and including the Y-connection in room A102 where the horizontal sanitary line transitions to the vertical sanitary sewer riser. Period of Performance is 30-Days after NTP. The facility location: VISN 15/ Colmery-O Neil VAM
- Status
- Closed
- Sector
- Waste Processing and Treatment, Commercial, Water Supply and Storage
- Location
- Topeka, Kansas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Replace Sanitary Sewer Lines Buildings 2&4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The contractor shall provide all labor, material, and equipment to replace approximately 12 linear feet sanitary sewer line from and including the toilet flange in room A206 to and including the Y-connection in room A102 where the horizontal sanitary line transitions to the vertical sanitary sewer riser. Period of Performance is 30-Days after NTP. The facility location: VISN 15/ Colmery-O Neil VAMC, 2200 Gage Blvd, Topeka, Kansas 66622. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kansas |
City | Topeka |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Commercial, Water Supply and Storage |
Article published date | 2024-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
