Replace submersible wastewater pumps at the St. Regis Wastewater Treatment Plant
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
The submersible wastewater pumps in the influent and effluent pump stations are 20 years old, performing at reduced capacity, and breaking down beyond repair. They need to be replaced. A reduction in the risk of wastewater contamination of the receiving environment is a strong off reserve benefit.
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replace submersible wastewater pumps at the St. Regis Wastewater Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The submersible wastewater pumps in the influent and effluent pump stations are 20 years old, performing at reduced capacity, and breaking down beyond repair. They need to be replaced. A reduction in the risk of wastewater contamination of the receiving environment is a strong off reserve benefit. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
