Replace the watermain on the entire length of Henry Street from Water Street to Spencer Street.
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
The water main was originally installed in 1935 making it 82+ years old. The pipe material is Cast Iron (CI), sizes are 150mm mostly and some 100mm and we want to upgrade to 200 mm Polyvinyl Chloride (PVC) to improve water quality and fire flows in this older section of Town.
- Status
- Closed
- Sector
- Metal, Water Supply and Storage, Road, Steel, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replace the watermain on the entire length of Henry Street from Water Street to Spencer Street.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The water main was originally installed in 1935 making it 82+ years old. The pipe material is Cast Iron (CI), sizes are 150mm mostly and some 100mm and we want to upgrade to 200 mm Polyvinyl Chloride (PVC) to improve water quality and fire flows in this older section of Town. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Metal, Water Supply and Storage, Road, Steel, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
