Replace Wastewater Treatment Plant
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The Work consists of: 1. The demolition of the existing Wastewater Treatment Plant and all associated elements noted in the Contract Documents (lift station, piping, etc). 2. The installation of the new Wastewater Treatment Plant and all associated elements noted in the Contract Documents (lift station, laundry, piping, electrical, etc.)
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Key West, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Replace Wastewater Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of: 1. The demolition of the existing Wastewater Treatment Plant and all associated elements noted in the Contract Documents (lift station, piping, etc). 2. The installation of the new Wastewater Treatment Plant and all associated elements noted in the Contract Documents (lift station, laundry, piping, electrical, etc.) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Key West |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
