Replacement and Upgrade of Debris Removal System in the Inlet Works at the Water Pollution Control Plant
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The project will evaluate alternative equipment (e.g. Muffin Monster Grinder) and install the preferred alternative solution. The Water Pollution Control Plant (WPCP) services approximately 29,000 residents in the Town of Orangeville. The Inlet Works building provides the first stages of wastewater treatment. A compactor was installed in the Inlet Works building in 2011 as part of a major capital
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project will evaluate alternative equipment (e.g. Muffin Monster Grinder) and install the preferred alternative solution. The Water Pollution Control Plant (WPCP) services approximately 29,000 residents in the Town of Orangeville. The Inlet Works building provides the first stages of wastewater treatment. A compactor was installed in the Inlet Works building in 2011 as part of a major capital improvement project at the WPCP. Components of the compactor have failed almost constantly since it was brought online in 2011. The first failure occurred in 2012, and over $40,000 has been spent on repairs in the past 2.5 years (outside of the warranty period). Almost the entire unit has been already replaced even though the useful life was estimated to be 25 years at time of installation. The operators continue to have problems with this equipment despite the on-going repairs and maintenance. Not having a properly working debris removal system at the headworks leads to numerous operational issues. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
