logo

Replacement Dual Power Invertor Modules for 8 Hybrid buses

Sector: Power Generation (CCGT) • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Purchase and installation of replacement Dual Power Invertor Modules for the 8 Hybrid buses in the fleet, noting the buses have exceeded the 6 year age when replacement is suggested. Replacement will result in a more reliable fleet

Status
Closed
Sector
Power Generation (CCGT)
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Replacement Dual Power Invertor Modules for 8 Hybrid buses

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Replacement Dual Power Invertor Modules for 8 Hybrid buses” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Purchase and installation of replacement Dual Power Invertor Modules for the 8 Hybrid buses in the fleet, noting the buses have exceeded the 6 year age when replacement is suggested. Replacement will result in a more reliable fleet

Original sector

Public Transit

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2026-03-08

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project