logo
ProjectClosed

Replacement Gym Entry Athletic Vestibule

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

Replacement Gym Entry Athletic Vestibule 2024 Athletic Vestibule Replacement Bid TEMPORARY FACILITIES AND CONTROLS 1. Temporary Utilities: a. Water, power for construction purposes and lighting are not available at the site and will not be made available to the roofing contractor. b. Provide all hoses, valves and connections for water from source designated by the owner when made available. c. Whe

Status
Closed
Sector
Commercial, Water Supply and Storage, Education, Power Transmission, Power Generation (CCGT), Government
Location
Homer, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Replacement Gym Entry Athletic Vestibule

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Replacement Gym Entry Athletic Vestibule” is an infrastructure initiative in the Commercial sector, located in Homer, Michigan, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement Gym Entry Athletic Vestibule 2024 Athletic Vestibule Replacement Bid TEMPORARY FACILITIES AND CONTROLS 1. Temporary Utilities: a. Water, power for construction purposes and lighting are not available at the site and will not be made available to the roofing contractor. b. Provide all hoses, valves and connections for water from source designated by the owner when made available. c. When available, electrical power should be extended as required from the source. Provide all trailer...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Homer

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Water Supply and Storage, Education, Power Transmission, Power Generation (CCGT), Government

Article published date

2024-03-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project