Replacement of 35 year old Pump at Well Building
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Replacement of 1982 pump; it is well past its life expectancy of 15-20 years and at risk of failure. The Well building houses two pumps, one at 15 l/s and the second at 7 l/s. The second pump would need to be replaced as there have been issues with it as of late that have been attributed to its age.
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of 35 year old Pump at Well Building
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of 1982 pump; it is well past its life expectancy of 15-20 years and at risk of failure. The Well building houses two pumps, one at 15 l/s and the second at 7 l/s. The second pump would need to be replaced as there have been issues with it as of late that have been attributed to its age. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
