Replacement of Archimedes Screw pumps at the Wallaceburg Water Pollution Control Plant
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
This is to design and construct for the replacement of the old troublesome Return Activated Sludge Pumps at the 10,800 m3 capacity Wallaceburg Water Pollution Control Plant Constructed in 1990. Pump system would be upgraded to centrifugal pumps instead of screw pumps replacement. The new design provides the following advantages and improvements compared to the existing system: - using centrifugal
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT)
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of Archimedes Screw pumps at the Wallaceburg Water Pollution Control Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This is to design and construct for the replacement of the old troublesome Return Activated Sludge Pumps at the 10,800 m3 capacity Wallaceburg Water Pollution Control Plant Constructed in 1990. Pump system would be upgraded to centrifugal pumps instead of screw pumps replacement. The new design provides the following advantages and improvements compared to the existing system: - using centrifugal pumps which have higher efficiency than screw pumps resulting in power savings - more pumping units operated by variable frequency drives allows operating the equipment more efficiently resulting in power savings - more pumping units provide better redundancy - new equipment is located inside and is easily accessible for maintenance - improved safety of operations - there is no splashing sewage by screw pumps - improved health and safety |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Power Generation (CCGT) |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
