logo

Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton.

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Completed

Replacement of blow off valves within the Charlton and Bradley distribution systems required for proper flushing. A proper flushing program is a practice endorsed by the MOECC (Ministry of Environment and Climate Change) and is a requirement of Charlton’s Drinking Water Quality Management System. Scope: To repair blow offs in Bradley subdivision at highway 560, on Christopher street and on the end

Status
Closed
Sector
Water Supply and Storage, Road, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton.” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of blow off valves within the Charlton and Bradley distribution systems required for proper flushing. A proper flushing program is a practice endorsed by the MOECC (Ministry of Environment and Climate Change) and is a requirement of Charlton’s Drinking Water Quality Management System. Scope: To repair blow offs in Bradley subdivision at highway 560, on Christopher street and on the end of Michael street. To repair blow offs in Charlton on the end of lakeshore street, and at the Charlton school. This will require some digging and parts however the exact nature of the defect will not be know until the underground component is exposed. Output: To have a distribution system capable of being flushed properly. Fix broken blow offs. Benefits: Functioning blow offs enables proper flushing to take place which is a key component of providing clean safe drinking water to the Charlton residents. Flushing helps to remove debris, bacteria, and pathogens and improves aesthetics of the drinking water.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Road, Government

Article published date

2025-07-06

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project