logo

Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton.

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Replacement of blow off valves within the Charlton and Bradley distribution systems required for proper flushing. A proper flushing program is a practice endorsed by the MOECC (Ministry of Environment and Climate Change) and is a requirement of Charlton’s Drinking Water Quality Management System. Scope: To repair blow offs in Bradley subdivision at highway 560, on Christopher street and on the end

Project Information FAQ

Project Information

5 Q
The project “Replacement of Blow off Valves throughout Distribution System at 50 Agnes Street, Charlton.” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Replacement of blow off valves within the Charlton and Bradley distribution systems required for proper flushing. A proper flushing program is a practice endorsed by the MOECC (Ministry of Environment and Climate Change) and is a requirement of Charlton’s Drinking Water Quality Management System. Scope: To repair blow offs in Bradley subdivision at highway 560, on Christopher street and on the end of Michael street. To repair blow offs in Charlton on the end of lakeshore street, and at the Charlton school. This will require some digging and parts however the exact nature of the defect will not be know until the underground component is exposed. Output: To have a distribution system capable of being flushed properly. Fix broken blow offs. Benefits: Functioning blow offs enables proper flushing to take place which is a key component of providing clean safe drinking water to the Charlton residents. Flushing helps to remove debris, bacteria, and pathogens and improves aesthetics of the drinking water.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data