Replacement of Bridge 11
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
This project involves the removal of the existing Bridge 11 structure replacing it with a new precast structure. The bridge replacement will also include a reinforced concrete distribution slab, a steel beam guide rail barrier system, and approximately 95 metres of road reconstruction and site restoration work.
- Status
- Closed
- Sector
- Steel, Metal, Rail, Bridge, Road, Cement, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of Bridge 11
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the removal of the existing Bridge 11 structure replacing it with a new precast structure. The bridge replacement will also include a reinforced concrete distribution slab, a steel beam guide rail barrier system, and approximately 95 metres of road reconstruction and site restoration work. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Steel, Metal, Rail, Bridge, Road, Cement, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
