Replacement of Bridge B35 - Airport Line, North of County Road #83
Completed · Ontario
Source: Infrastructure Canada
The Project consists of replacing the Bridge B35, located on Airport Line, North of County Road 83, in the Municipality of Bluewater, Ontario. The Project scope includes replacing the existing 24.4 m span narrow rigid frame bridge (6.1 m curb to curb width) with a 28.7 m clear span integral abutment bridge. The new bridge will have a roadway width of 10.5 meters. Work will also be done to raise th
- Status
- Closed
- Sector
- Airport, Bridge, Road
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of Bridge B35 - Airport Line, North of County Road #83
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project consists of replacing the Bridge B35, located on Airport Line, North of County Road 83, in the Municipality of Bluewater, Ontario. The Project scope includes replacing the existing 24.4 m span narrow rigid frame bridge (6.1 m curb to curb width) with a 28.7 m clear span integral abutment bridge. The new bridge will have a roadway width of 10.5 meters. Work will also be done to raise the bridge by approximately 0.5m to maintain vertical alignment. The approaches to the bridge will be re-constructed for a total length of about 500 m and improved to the standards for an 80 km/hr design speed. The Project aims to improve safety, reduce service interruptions, and contribute to a more reliable bridge asset. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Airport, Bridge, Road |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Airport projects in Canada
- Highway Rehab -- Bridge rehabilitation, Culvert rehabilitation, Culvert replacement Aviation Bridge and Walkley Rd, Ottawa
- Russell-Binscarth Airport Resurfacing
- Stoney Trail Northeast
- Iqaluit International Airport Improvement Project
- Réseau électrique métropolitain de Montréal (Montreal LRT)
- Canada Line
- Electric Vehicle Charging Station at Pearson Airport - Terminal 3
- Electric Vehicle Charging Station at Airport Mariott (ImPark)
