logo

Replacement of Cape Fear Memorial Bridge

One of 10,000+ projects Taiyo tracks in North Carolina.

Source: WECT

Project
Planned

The U.S. Army Corps of Engineers (USACE) completed a technical analysis recommending the replacement of the Cape Fear Memorial Bridge with a fixed bridge having a horizontal clearance of 450 feet and a vertical clearance of 135 feet to avoid adverse effects to the project. The North Carolina Department of Transportation (NCDOT) is considering two alternatives for the replacement: Alternative B wit

Status
Prospective
Sector
Bridge, Government
Location
Wilmington, North Carolina, United States of America
Updated
22 Jul 2026
Source
WECT

ConstructChat

Ask ConstructChat about Replacement of Cape Fear Memorial Bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Replacement of Cape Fear Memorial Bridge” is an infrastructure initiative in the Bridge sector, located in Wilmington, North Carolina, United States. Taiyo aggregates data on it from WECT.

Participants

Sponsoring Agency

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The U.S. Army Corps of Engineers (USACE) completed a technical analysis recommending the replacement of the Cape Fear Memorial Bridge with a fixed bridge having a horizontal clearance of 450 feet and a vertical clearance of 135 feet to avoid adverse effects to the project. The North Carolina Department of Transportation (NCDOT) is considering two alternatives for the replacement: Alternative B with a vertical clearance of 135 feet and Alternative C with a vertical clearance ranging from 100 to 135 feet. The project cost estimate has increased to $1.1 billion from the previously reported $450 million.

Original sector

Transportation

Budget

Location

Country

United States of America (USA)

State

North Carolina

City

Wilmington

Source

Source

WECT

URL

More Details

Record type

Project

Sector

Bridge, Government

Article published date

2025-05-25

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project