logo
ProjectClosed

Replacement of CT DEEP Bridge E159

Closed · Connecticut · Last reported Dec 2024

Source: Dodge USA

Replacement of the locally iconic Chatfield Hollow State Park Covered Bridge. Project includes but is not limited to demolition of existing abutments and pier. cofferdam installation. installation of new cast-in-olace concrete abutments. installation of new superstructure including steel stringers with timber decking and wall and roof sections which are modeled after the pre-existing bridge's, gen

Status
Closed
Sector
Government, Forest Products and Packaging, Steel, Cement, Road, Bridge, Commercial, Car parking, Automotive, Metal
Location
Killingworth, Connecticut, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Replacement of CT DEEP Bridge E159

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Replacement of CT DEEP Bridge E159” is an infrastructure initiative in the Government sector, located in Killingworth, Connecticut, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replacement of the locally iconic Chatfield Hollow State Park Covered Bridge. Project includes but is not limited to demolition of existing abutments and pier. cofferdam installation. installation of new cast-in-olace concrete abutments. installation of new superstructure including steel stringers with timber decking and wall and roof sections which are modeled after the pre-existing bridge's, general site improvements and rock weir installation.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Connecticut

City

Killingworth

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Government, Forest Products and Packaging, Steel, Cement, Road, Bridge, Commercial, Car parking, Automotive, Metal

Article published date

2024-12-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project