Replacement of current telephone system in use at London Transit
Sector: Public Transit • Location: Ontario, Canada
Source: Infrastructure Canada
Replacement of telephone switching system for both conventional and specialized transit operations. Current system relies on old technology and is subject to frequent failure. Replacement will provide expanded feature set as well as a more reliable platform.
- Status
- Closed
- Sector
- Public Transit
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of current telephone system in use at London Transit
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of telephone switching system for both conventional and specialized transit operations. Current system relies on old technology and is subject to frequent failure. Replacement will provide expanded feature set as well as a more reliable platform. |
Original sector | Public Transit |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
