logo

Replacement of existing culvert on trail E108 with new engineered steel bridge

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Mitigate erosion and washouts due to extreme frequent freeze thaw cycles, weather events effects of climate change. Provide safe passage and access over east arm of the Miskww-Ziibi river for multi-user trail system including motorized and non-motorized users. Provide sustainable and easily maintained access to the trail system. Links multiple communities via off-road trails. Replace existing dete

Status
Closed
Sector
Water Supply and Storage, Steel, Metal, Bridge, Road, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Replacement of existing culvert on trail E108 with new engineered steel bridge

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Replacement of existing culvert on trail E108 with new engineered steel bridge” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Mitigate erosion and washouts due to extreme frequent freeze thaw cycles, weather events effects of climate change. Provide safe passage and access over east arm of the Miskww-Ziibi river for multi-user trail system including motorized and non-motorized users. Provide sustainable and easily maintained access to the trail system. Links multiple communities via off-road trails. Replace existing deteriorated 4’ diameter culvert with new 30’ clear span steel bridge including bearing pads, buttress improvements and improved approaches, improve water flow, stabilize existing trail bed and river banks from further erosion. Lower potential environmental impact of the trail system on the watercourse, improved user access, mitigate any safety concerns. Lower potential for spring flooding or impacts from severe weather events, provide safe river crossing for snow grooming equipment.

Original sector

Community, Culture and Recreation

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Steel, Metal, Bridge, Road, Government

Article published date

2026-01-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project