Replacement of existing Marine Drive Bridge over Mosquito Creek
Sector: Water Supply and Storage • Location: British Columbia, Canada
Source: Infrastructure Canada
To replace the Marine Drive Bridge over Mosquito Creek. Project scope includes demolition of existing bridge, construction of a new single span, 20m long, 6 lane bridge, bike lanes and full width pedestrian sidewalks in both directions and replacement of water, sewer, natural gas, communication and district energy utilities on the bridge.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | To replace the Marine Drive Bridge over Mosquito Creek. Project scope includes demolition of existing bridge, construction of a new single span, 20m long, 6 lane bridge, bike lanes and full width pedestrian sidewalks in both directions and replacement of water, sewer, natural gas, communication and district energy utilities on the bridge. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
