Replacement of Foundation Drain Collectors -Phase 1
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
The rehabilitation of the existing drain collectors requires 50 metres of new foundation drain collector sewer from the existing storm sewer outlet. The foundation drain collector will be approximately 3 metres deep. Storm services will be installed from the foundation drain collector and connected to the existing foundation drain and eliminate the use of sump pumps.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of Foundation Drain Collectors -Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The rehabilitation of the existing drain collectors requires 50 metres of new foundation drain collector sewer from the existing storm sewer outlet. The foundation drain collector will be approximately 3 metres deep. Storm services will be installed from the foundation drain collector and connected to the existing foundation drain and eliminate the use of sump pumps. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
