logo

Replacement of lids on the digester tanks at Waste Water Treatment Facility at 92 Alexandra Avenue, Point Edward

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
In Progress

Lids on the digester tanks will be replaced in order to make the gas collection and burning system function properly. Gases are currently dissipating into the atmosphere. The seals on the digester lids have broken down over the years and we are concerned that if inspected we could be ordered to remedy the problem within a certain time period. This is a project that we hoped to complete within the

Project Information FAQ

Project Information

4 Q
The project “Replacement of lids on the digester tanks at Waste Water Treatment Facility at 92 Alexandra Avenue, Point Edward” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

in progress

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Lids on the digester tanks will be replaced in order to make the gas collection and burning system function properly. Gases are currently dissipating into the atmosphere. The seals on the digester lids have broken down over the years and we are concerned that if inspected we could be ordered to remedy the problem within a certain time period. This is a project that we hoped to complete within the next few years but would like to complete it sooner if funding is available. It is not possible to quantify the amount of gas that would be collected and burned off as there is no measuring system available. The end result of the completion of this project would be the elimination of gases being released to the atmosphere.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data