Replacement of Norwood’s Treated Water Standpipe
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
The project will rehabilitate a water standpipe in Asphodel-Norwood, Ontario. The work will involve replacing the existing standpipe with a new standpipe, replacing four well pumps, upgrading electrical and control systems, and installing 75 metres of watermains. The project will fund improvements to reservoirs, which will increase access to potable water by increasing the safety and durability
- Status
- Closed
- Sector
- Water Supply and Storage
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of Norwood’s Treated Water Standpipe
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project will rehabilitate a water standpipe in Asphodel-Norwood, Ontario. The work will involve replacing the existing standpipe with a new standpipe, replacing four well pumps, upgrading electrical and control systems, and installing 75 metres of watermains. The project will fund improvements to reservoirs, which will increase access to potable water by increasing the safety and durability of the water storage infrastructure. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
