logo

Replacement of Orion VII Hybrid Bus Components

Sector: Government • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This program covers the cost of the Orion VII Hybrid Bus Fleet components. These include the following major hybrid components: AC Traction Generator, AC Traction Motor and Propulsion Control System. Replacement of these components are on an as fail basis and scheduled when timing is matching with the bus rebuild program.

Status
Closed
Sector
Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Replacement of Orion VII Hybrid Bus Components

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Replacement of Orion VII Hybrid Bus Components” is an infrastructure initiative in the Government sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This program covers the cost of the Orion VII Hybrid Bus Fleet components. These include the following major hybrid components: AC Traction Generator, AC Traction Motor and Propulsion Control System. Replacement of these components are on an as fail basis and scheduled when timing is matching with the bus rebuild program.

Original sector

Public Transit

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project