logo

Replacement of Single Train Membrane at Raymond A. Barker Water Treatment Plant located at 2 Raglan Street, Collingwood

Sector: Hospital • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

This proposed upgrade will see the replacement of a single train of membranes at Raymond A. Barker Water Treatment Plant in order to increase treatment capacity and output supply of the Plant to meet the long-term water demands of Town of New Tecumseth (providing drinking water to a population of 24,800 for Alliston and Beeton). Drinking water is currently provided to Alliston and Beeton via a pip

Status
Closed
Sector
Hospital, Water Supply and Storage, Manufacturing (Industrial), Rail, Road, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Replacement of Single Train Membrane at Raymond A. Barker Water Treatment Plant located at 2 Raglan Street, Collingwood

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Replacement of Single Train Membrane at Raymond A. Barker Water Treatment Plant located at 2 Raglan Street, Collingwood” is an infrastructure initiative in the Hospital sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This proposed upgrade will see the replacement of a single train of membranes at Raymond A. Barker Water Treatment Plant in order to increase treatment capacity and output supply of the Plant to meet the long-term water demands of Town of New Tecumseth (providing drinking water to a population of 24,800 for Alliston and Beeton). Drinking water is currently provided to Alliston and Beeton via a pipeline from Collingwood. The existing membranes have reached the end of their useful life and New Tecumseth is obligated to cost share in rehabilitation projects at the Raymond A. Barker Water Treatment Plant as outlined in the Primary Water Supply Agreement. The upgrades to the membranes will maintain treatment capacity levels and allow an increase in supply to the Town to meet the current water demands and long-term supply needs. Original timeframe for this upgrade was scheduled for 2018, and as a result of this funding the project can now be advanced, allowing for earlier implementation and ensuring the security of supply for the Town of New Tecumseth, including primary employers and essential health services such as Honda Manufacturing of Canada, Baxter Corporation, and Alliston Memorial Hospital.

Original sector

Drinking Water and Wastewater

Budget

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Hospital, Water Supply and Storage, Manufacturing (Industrial), Rail, Road, Government

Article published date

2025-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project