Replacement of the Blind Bridge on Abraham Line
Sector: Raw Materials • Location: Ontario, Canada
Source: Infrastructure Canada
The project is the replacement of the Blind Bridge on Abraham line in the Municipality of Morris-Turnberry, Ontario. The scope of the project includes replacing the aging 38.7 metre span, single late bridge with a new 2 span structure with a deck length of about 49.6 meters. The new structure will have a barrier to barrier width of approximately 6.3 meters. The new bridge will not have weight rest
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project is the replacement of the Blind Bridge on Abraham line in the Municipality of Morris-Turnberry, Ontario. The scope of the project includes replacing the aging 38.7 metre span, single late bridge with a new 2 span structure with a deck length of about 49.6 meters. The new structure will have a barrier to barrier width of approximately 6.3 meters. The new bridge will not have weight restrictions. The project aims to address public health and safety concerns, reduce the probability of asset failure and service interruptions, and improve traffic flow and access to the public. The existing bridge is too narrow and with current load limits, insufficient to support most agricultural equipment and associated requirements. Residents are forced to cross the river using a low flow crossing that is unsafe and often flooded, risking equipment and safety in order to access their properties or tend to their livestock or lands. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
