Replacement of the Lagoon inlet works at the Sutton Street Sewage Pump Station (SPS) and Treatment Facility.
Sector: Water Supply and Storage • Location: Ontario, Canada
Source: Infrastructure Canada
Replacement of the existing concrete lagoon inlet works and 375mm inlet piping (HDPE, PVC) which is in need of upgrade, to be able to handle a peak flow of up to 150 L/s and include flow control devices to direct wastewater to either the north or south lagoon cell, including the provision for future wastewater sampling equipment and alum dosing.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Replacement of the existing concrete lagoon inlet works and 375mm inlet piping (HDPE, PVC) which is in need of upgrade, to be able to handle a peak flow of up to 150 L/s and include flow control devices to direct wastewater to either the north or south lagoon cell, including the provision for future wastewater sampling equipment and alum dosing. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
