Replacement of the Programmable Logic Controller at the Mindemoya Water Treatment Plant
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
Remove existing Programmable Logic Controller (PLC), which was installed as part of the original plant construction in 1995, and replace with a new Programmable Logic Controller, this project will help ensure clean water is produced for all of the residents of Manitoulin.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of the Programmable Logic Controller at the Mindemoya Water Treatment Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Remove existing Programmable Logic Controller (PLC), which was installed as part of the original plant construction in 1995, and replace with a new Programmable Logic Controller, this project will help ensure clean water is produced for all of the residents of Manitoulin. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-10-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
