Replacement of two oil interceptors at the Lebourgneuf operational centre
One of 10,000+ projects Taiyo tracks in Quebec.
Source: Infrastructure Canada
Replacing two oil interceptors and two waste oil tanks at the Lebourgneuf centre’s minor mechanical shop will ensure that the RTC can guarantee its compliance with Québec City’s down-the-drain standards.
- Status
- Closed
- Sector
- Oil and Gas, Commercial
- Location
- Quebec, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of two oil interceptors at the Lebourgneuf operational centre
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacing two oil interceptors and two waste oil tanks at the Lebourgneuf centre’s minor mechanical shop will ensure that the RTC can guarantee its compliance with Québec City’s down-the-drain standards. |
Original sector | Public Transit |
Location
Country | Canada |
State | Quebec |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Commercial |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
