Replacement of U.S. 51 Ohio River Bridge
Sector: Bridge • Location: Ballard County, Kentucky, United States
Source: KTVZ
Plans are in place to replace the U.S. 51 Ohio River Bridge, with construction tentatively scheduled to start in 2028 and expected to take four to five years to complete.
- Status
- Prospective
- Sector
- Bridge
- Location
- Ballard County, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- KTVZ
ConstructChat
Ask ConstructChat about Replacement of U.S. 51 Ohio River Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Plans are in place to replace the U.S. 51 Ohio River Bridge, with construction tentatively scheduled to start in 2028 and expected to take four to five years to complete. |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Ballard County |
Source
Source | KTVZ |
URL |
More Details
Record type | Project |
Sector | Bridge |
Article published date | 2025-04-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Bridge projects in United States
- Atlas Air Worldwide and Titan Aviation Holdings Announce Financing Facilities with CDPQ, BNP Paribas, and volofin
- Route 29 Tunnel, Trenton, NJ
- Ortega Highway Interchange Replacement Project
- Elgin O’Hare Western Access Project, Illinois
- Queen Elizabeth Way Widening
- I-485 Charlotte Outer Loop, North Carolina
- Kosciuszko Bridge Replacement Project, New York, US
- Complete 540 (Triangle Expressway Southeast Extension), North Carolina
