logo

Replacement of wastewater, water, storm sewer and road infrastrucutre on Winnipeg Road and Toronto Boulevard in the village of Vanastra with the Municipality of Huron East

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The Project involves the replacement of water main, storm and sanitary sewers with the reconstruction of two road sections in the southeast section of Vanastra being Winnipeg Road and Toronto Boulevard. The work description includes the replacement of the existing 200mm sanitary sewer main with new 250 mm in a 160 meter section of Winnipeg Road and 250mm sanitary sewer in 75 meters of Toronto Boul

Project Information FAQ

Project Information

3 Q
The project “Replacement of wastewater, water, storm sewer and road infrastrucutre on Winnipeg Road and Toronto Boulevard in the village of Vanastra with the Municipality of Huron East” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project involves the replacement of water main, storm and sanitary sewers with the reconstruction of two road sections in the southeast section of Vanastra being Winnipeg Road and Toronto Boulevard. The work description includes the replacement of the existing 200mm sanitary sewer main with new 250 mm in a 160 meter section of Winnipeg Road and 250mm sanitary sewer in 75 meters of Toronto Boulevard along with the replacement of existing private drain connections to the affected properties. The infrastructure replacement also involves replacing the existing 200mm water main and service connections with upgrades to the existing surface drainage within the affected area. The overall plan is to systematically rehabilitate the infrastructure that is plagued with infiltration, cross connections and water main breaks to the residential area.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data