Replacement of Water Mains in Peel
One of 10,000+ projects Taiyo tracks in Ontario.
Source: Infrastructure Canada
Replacement of water mains, system improvements and looping of dead-end mains at various locations within the Region of Peel to improve water quality and reliability of the distribution system. This work includes the replacement of watermains ranging in size from 50 to 300 mm on 26 different streets, adding up to a total of 10.4 km in length.
- Status
- Closed
- Sector
- Water Supply and Storage, Government
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Replacement of Water Mains in Peel
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Replacement of water mains, system improvements and looping of dead-end mains at various locations within the Region of Peel to improve water quality and reliability of the distribution system. This work includes the replacement of watermains ranging in size from 50 to 300 mm on 26 different streets, adding up to a total of 10.4 km in length. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
