Repowering of Muel Wind Farm
One of 51 projects Taiyo tracks in Aragon.
Source: Windtech International
RWE has commenced the repowering of its Muel wind farm in the Aragon region near Zaragoza. The site’s 27 ageing turbines, totalling 16.2 MW, will be replaced by three 6.6 MW units, increasing overall capacity to 19.8 MW. Initial construction has started, with commissioning scheduled for the end of 2025.
- Status
- Under Construction
- Sector
- Raw Materials, Wind
- Location
- Zaragoza, Aragon, Spain
- Updated
- 22 Jul 2026
- Source
- Windtech International
ConstructChat
Ask ConstructChat about Repowering of Muel Wind Farm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | RWE has commenced the repowering of its Muel wind farm in the Aragon region near Zaragoza. The site’s 27 ageing turbines, totalling 16.2 MW, will be replaced by three 6.6 MW units, increasing overall capacity to 19.8 MW. Initial construction has started, with commissioning scheduled for the end of 2025. |
Original sector | Renewable Energy |
Location
Country | Spain |
State | Aragon |
City | Zaragoza |
Source
Source | Windtech International |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Wind |
Article published date | 2025-04-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
