logo

Repowering of Muel Wind Farm

One of 51 projects Taiyo tracks in Aragon.

Source: Windtech International

Project
Under Construction

RWE has commenced the repowering of its Muel wind farm in the Aragon region near Zaragoza. The site’s 27 ageing turbines, totalling 16.2 MW, will be replaced by three 6.6 MW units, increasing overall capacity to 19.8 MW. Initial construction has started, with commissioning scheduled for the end of 2025.

Status
Under Construction
Sector
Raw Materials, Wind
Location
Zaragoza, Aragon, Spain
Updated
22 Jul 2026
Source
Windtech International

ConstructChat

Ask ConstructChat about Repowering of Muel Wind Farm

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Repowering of Muel Wind Farm” is an infrastructure initiative in the Raw Materials sector, located in Zaragoza, Aragon, Spain. Taiyo aggregates data on it from Windtech International.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

RWE has commenced the repowering of its Muel wind farm in the Aragon region near Zaragoza. The site’s 27 ageing turbines, totalling 16.2 MW, will be replaced by three 6.6 MW units, increasing overall capacity to 19.8 MW. Initial construction has started, with commissioning scheduled for the end of 2025.

Original sector

Renewable Energy

Location

Country

Spain

State

Aragon

City

Zaragoza

Source

Source

Windtech International

URL

More Details

Record type

Project

Sector

Raw Materials, Wind

Article published date

2025-04-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project