logo
ProjectScaled Back

Repsol Green Hydrogen Electrolyser Capacity

One of 10,000+ projects Taiyo tracks in Spain.

Source: Reuters

Repsol cut its 2030 target for green hydrogen production by up to 63% in February 2025 to between 0.7 GW and 1.2 GW of electrolyser capacity by the end of the decade due to high costs and subsidy reliance.

Status
Prospective
Sector
Power Generation (CCGT), Hydrogen
Location
Spain
Updated
22 Jul 2026
Source
Reuters

ConstructChat

Ask ConstructChat about Repsol Green Hydrogen Electrolyser Capacity

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Repsol Green Hydrogen Electrolyser Capacity” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Spain. Taiyo aggregates data on it from Reuters.

Participants

Not available for this record.

Status

Original status

scaled back

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Repsol cut its 2030 target for green hydrogen production by up to 63% in February 2025 to between 0.7 GW and 1.2 GW of electrolyser capacity by the end of the decade due to high costs and subsidy reliance.

Original sector

Energy

Location

Country

Spain

Source

Source

Reuters

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Hydrogen

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project